A Letter to the Editor over the weekend, written by two people who were involved with the Renewal Forum held after the hurricane, basically blasted MDOT for their continued insistence on their proposed bridge design for the Biloxi-Ocean Springs span. They demand that MDOT scrap "Bridgezilla" and get on with building a temporary span along the path of the destroyed bridge (using the remaining pillars if possible), while everyone sits down and plans a new permanent bridge that everyone can agree with (or at least agree enough to get it built).
The two letter writers, and others of their peers, appear to have created two new websites to further their causes: www.msrenewalcoalition.org and www.bridgenow.org . The former looks to be a support page for the policies recommended by the Renewal Forum, while the latter is plainly a call for MDOT to scrap their design, build a temporary bridge, then plan and build a permanent bridge along the lines of that proposed in the Renewal Forum.
I took a look through the latter site this evening, in particular their FAQ. One particular entry in their FAQ perpetuates the theory, held by many of the Renewal forumers and those in Ocean Springs and the subject of several letters over the last month, that MDOT's 6-lane bridge proposal is really a "10-lane bridge".
I immediately sent an E-mail to the bridgenow.org people explaining the fallacy of this misinformation (I called it misinformation, anyway). Some of the particulars of MDOT's bridge proposal are available on their website if you know where to look (trust me, it took some digging). Their proposal is for, in each direction, 3 12-ft driving lanes, an 8-ft inside shoulder, and a 10-ft outside shoulder. For them to squeeze 5 lanes out of that, they would have to eliminate both shoulders and make the driving lanes about 10.5 feet wide, neither of which would be likely to pass muster with FHWA (the Feds), who would have a vote in the matter. Although it would result in only 6 feet of combined shoulder, having 4 lanes each way would be a future possibility, but 5 lanes each way is a bit of a stretch.
To my surprise (and impressment), I received a reply from a Dr. Jeffrey Bounds, who agreed that 10 lanes would be a stretch and said they would revise the FAQ to reflect such.
Goes to show that, even amidst disagreement (I disagree with the coalition on how many lanes the bridge needs, though I generally agree with their other positions on the bridge), there can still be civility. MDOT would do well to take a lesson on that...
Adam's blog is now roaming the dirt roads of Vermont, chronicling transportation and travels one hill at a time...
Showing posts with label Biloxi. Show all posts
Showing posts with label Biloxi. Show all posts
January 30, 2006
January 26, 2006
More bridge blues for MDOT
What little of MDOT's public image remains continues to take a downward slide, with two more recent events. First, they only received one bid for the Biloxi-Ocean Springs bridge replacement, which came in significantly higher than estimated. And the company that made that bid also bid on the Bay St. Louis bridge and preferred the latter if they had to choose between the two. So while MDOT now has a contract out for replacing the Bay St. Louis bridge (albeit $66 million higher than estimated), they're still without a contract for their Biloxi-Ocean Springs plan.
And as if that wasn't enough, the Coast Guard has now weighed in on the Biloxi-Ocean Springs bridge issues (now centered over the need of a drawbridge vs. a fixed-span), saying that MDOT needs to resolve those issues before they'll grant approval. Not only has Trinity Yachts said they need a drawbridge, but Northrup Grumman has piped in with the same concern, as has Harrison County's economic development coordinator.
It got back enough the past few days to where your's truly weighed in with a Letter to the Editor in the SunHerald. I basically lambasted both sides for ignorance when it came to the fight over adding a drawspan to MDOT's bridge proposal. And lo and behold, this morning in my E-mail box was an E-mail from the vice president of Trinity Yachts explaining his position and basically taking issue with my calling them ignorant.
Will be interesting to see how this all pans out, with there now being 4 major issues surrounding the bridge replacement (drawspan, number of lanes, location, and lack of bidders). Unfortunately, I don't think the final product will wind up serving the best interests of the Coast.
And as if that wasn't enough, the Coast Guard has now weighed in on the Biloxi-Ocean Springs bridge issues (now centered over the need of a drawbridge vs. a fixed-span), saying that MDOT needs to resolve those issues before they'll grant approval. Not only has Trinity Yachts said they need a drawbridge, but Northrup Grumman has piped in with the same concern, as has Harrison County's economic development coordinator.
It got back enough the past few days to where your's truly weighed in with a Letter to the Editor in the SunHerald. I basically lambasted both sides for ignorance when it came to the fight over adding a drawspan to MDOT's bridge proposal. And lo and behold, this morning in my E-mail box was an E-mail from the vice president of Trinity Yachts explaining his position and basically taking issue with my calling them ignorant.
Will be interesting to see how this all pans out, with there now being 4 major issues surrounding the bridge replacement (drawspan, number of lanes, location, and lack of bidders). Unfortunately, I don't think the final product will wind up serving the best interests of the Coast.
January 14, 2006
6-lanes for Biloxi-Ocean Springs Bridge
The handwriting is on the wall, so to speak. After hearing concerns from Ocean Springs Mayor Moran (who is against a 6-lane replacement for the Biloxi-Ocean Springs bridge) and reviewing traffic studies for the bridge done by both MDOT and the city, the Federal Highway Administration (FHWA) has endorsed MDOT's proposal for a 6-lane span. Short of a lawsuit, which would only delay the bridge that much further (something NEITHER side wants), MDOT's bridge proposal will proceed.
Somewhat unrelated, but possibly affecting the bridge proposal even further, is a letter sent by Harrison County Development Commission Executive Director Leland Speed to MDOT requesting a drawspan anyway, in order to promote additional industry along the county's Industrial Seaway. The driving force behind the letter is Trinity Yachts, who moved onto land along the seaway after Katrina and is a builder of large yachts. One yacht proposal they are bidding on would require a vertical clearance of up to 120 feet, significantly higher than the 85-foot clearance that MDOT's bridge proposal allows. The concern is that building a fixed-span either that low or without a drawspan will hamper industrial recruitment efforts, not to mention Trinity Yachts' hopes of winning the "mega-yacht" contract.
My thoughts: though I don't like the additional mainenance/operational costs of keeping a drawbridge at Biloxi-Ocean Springs (and neither does MDOT), there may be significant merit in keeping a drawbridge there, in that industrial development along the Seaway would help to diversify the Coast's economy plus give it a springboard to bounce back from the hurricane's destruction. Using the new Woodrow Wilson Bridge along the D.C. Beltway as an example, a well-designed drawbridge will reduce the number of drawbridge openings required, yet still have the flexibility that industry along the Seaway requires. My suggestion would be for a drawbridge with a 65 to 70 foot clearance, with drawspan openings by appointment and prohibited (except for emergencies) during peak traffic hours.
Somewhat unrelated, but possibly affecting the bridge proposal even further, is a letter sent by Harrison County Development Commission Executive Director Leland Speed to MDOT requesting a drawspan anyway, in order to promote additional industry along the county's Industrial Seaway. The driving force behind the letter is Trinity Yachts, who moved onto land along the seaway after Katrina and is a builder of large yachts. One yacht proposal they are bidding on would require a vertical clearance of up to 120 feet, significantly higher than the 85-foot clearance that MDOT's bridge proposal allows. The concern is that building a fixed-span either that low or without a drawspan will hamper industrial recruitment efforts, not to mention Trinity Yachts' hopes of winning the "mega-yacht" contract.
My thoughts: though I don't like the additional mainenance/operational costs of keeping a drawbridge at Biloxi-Ocean Springs (and neither does MDOT), there may be significant merit in keeping a drawbridge there, in that industrial development along the Seaway would help to diversify the Coast's economy plus give it a springboard to bounce back from the hurricane's destruction. Using the new Woodrow Wilson Bridge along the D.C. Beltway as an example, a well-designed drawbridge will reduce the number of drawbridge openings required, yet still have the flexibility that industry along the Seaway requires. My suggestion would be for a drawbridge with a 65 to 70 foot clearance, with drawspan openings by appointment and prohibited (except for emergencies) during peak traffic hours.
December 02, 2005
Building a new Biloxi-Ocean Springs bridge
A lot of discussion and debate from all over has gone into the proposal to replace US 90's bridge over Biloxi Bay (locally known as the Biloxi-Ocean Springs Bridge) in the wake of Hurricane Katrina. Many are at odds with MDOT because the feel MDOT is forcing their plan for the bridge down on them...especially those in Ocean Springs. Complaints up the wazoo have been made against MDOT for the way they're handling the situation. The SunHerald seems to have an article, letter, or sound byte every day about the bridge. From my unscientific poll, it seems comments in the SunHerald are 40/60 for/against MDOT's bridge plan.
Here's MDOT's plan: their plan is for a 93-ft high-rise bridge (high enough to eliminate the need for a draw span) at the same location as the bridge destroyed by Katrina. The bridge would be 6 lanes wide plus full shoulders and a bike/ped path...the cited width of the bridge is 120-ft.
The New Urbanists and Renewal Forumers, not surprisingly, are solidly against MDOT's plan. They feel A) that the bridge should be built along the CSX RR corridor, to tie into their vision of a relocated US 90 along the CSX corridor through Biloxi and Gulfport, and B) that the bridge should be no more than 4 lanes wide.
MDOT originally wanted the bridge contact let by the end of November. That's been put on hold due to a holdup in federal relief/recovery dollars...MDOT claims they've already spent $100 million on hurricane recovery, and until yesterday had only received $5 million in reimbursement from the Feds. Yesterday they got $20 million more, but that still leaves a $75 million backlog...significant when one considers a new Biloxi-Ocean Springs bridge will easily top $200 million, regardless of the design/location chosen.
My take on the bridge: I've borrowed elements from both sides in crafting my proposal. First up: MDOT should build a 2-lane "temporary" span at the existing location to get US 90 traffic at least moving and avoid an up-to-10-mile detour via I-10. The New Urbanists feel that this is the right way to go until a permanent bridge can be agreed upon and built, and I tend to agree.
My "permanent" solution, which is hingent on the CSX tracks being relocated north of I-10 as many propose, is to build a signature span generally at the location of the CSX RR crossing of Biloxi Bay. This span should be aesthetic in design, a high-bridge to eliminate need for a drawbridge span, and have 6 traffic lanes. The New Urbanists disagree, but I feel existing traffic is borderline enough to justify 6 lanes, and future traffic volumes will certainly warrant a wider span. Rather than full shoulders on both sides of each roadway, I would carry a 2-ft left shoulder and a 10-ft right shoulder on each side. My signature span would also carry a dual-track LRT line across the Bay. Although my span is wider than MDOT's proposal (132-ft vs 120-ft), my span carries both vehicle lanes and rail transit.
With a "permanent" span, the 2-lane "temporary" span could then be converted into a bicycle/pedestrian crossing, providing non-vehicular traffic a means to get across Biloxi Bay.
This and my other ideas for my transportation vision for the Gulf Coast can be found on my website here: http://www.ajfroggie.com/roads/gulfcoast/
Here's MDOT's plan: their plan is for a 93-ft high-rise bridge (high enough to eliminate the need for a draw span) at the same location as the bridge destroyed by Katrina. The bridge would be 6 lanes wide plus full shoulders and a bike/ped path...the cited width of the bridge is 120-ft.
The New Urbanists and Renewal Forumers, not surprisingly, are solidly against MDOT's plan. They feel A) that the bridge should be built along the CSX RR corridor, to tie into their vision of a relocated US 90 along the CSX corridor through Biloxi and Gulfport, and B) that the bridge should be no more than 4 lanes wide.
MDOT originally wanted the bridge contact let by the end of November. That's been put on hold due to a holdup in federal relief/recovery dollars...MDOT claims they've already spent $100 million on hurricane recovery, and until yesterday had only received $5 million in reimbursement from the Feds. Yesterday they got $20 million more, but that still leaves a $75 million backlog...significant when one considers a new Biloxi-Ocean Springs bridge will easily top $200 million, regardless of the design/location chosen.
My take on the bridge: I've borrowed elements from both sides in crafting my proposal. First up: MDOT should build a 2-lane "temporary" span at the existing location to get US 90 traffic at least moving and avoid an up-to-10-mile detour via I-10. The New Urbanists feel that this is the right way to go until a permanent bridge can be agreed upon and built, and I tend to agree.
My "permanent" solution, which is hingent on the CSX tracks being relocated north of I-10 as many propose, is to build a signature span generally at the location of the CSX RR crossing of Biloxi Bay. This span should be aesthetic in design, a high-bridge to eliminate need for a drawbridge span, and have 6 traffic lanes. The New Urbanists disagree, but I feel existing traffic is borderline enough to justify 6 lanes, and future traffic volumes will certainly warrant a wider span. Rather than full shoulders on both sides of each roadway, I would carry a 2-ft left shoulder and a 10-ft right shoulder on each side. My signature span would also carry a dual-track LRT line across the Bay. Although my span is wider than MDOT's proposal (132-ft vs 120-ft), my span carries both vehicle lanes and rail transit.
With a "permanent" span, the 2-lane "temporary" span could then be converted into a bicycle/pedestrian crossing, providing non-vehicular traffic a means to get across Biloxi Bay.
This and my other ideas for my transportation vision for the Gulf Coast can be found on my website here: http://www.ajfroggie.com/roads/gulfcoast/