The SunHerald printed my letter on the 22nd. The only change they made was to the title...they used Price gouging? Or basic supply and demand?
Only two responses thus far, both via E-mail.
Here's one:
Just a note on economics: As you correctly point out, the supply and demand
balance of Coast housing has changed, but that doesn't imply that raising
rents isn't "gouging." The lack of housing simply allows rising rents; it doesn't
require it.
An interesting thought on the rent raising, though I still think if you have a short supply and high demand, that's going to bump the price up in order to ensure a supply. Basic market forces there.
Here's the other E-mail reply:
Excellent letter... Thank God there are people like you who understand
basic supply and demand. It is going to be tough here for quite a
while... Things will get better, but rent may not ever go back down to
pre-Katrina levels.
I have faith that if we can get our housing unit levels back up to what they were (if not higher) pre-Katrina, that rents will eventually go back down.
Note I said "if". Because it will take the residents convincing their planning
commissions and city councils/county boards of supervisors that housing developments that encompass all income levels (and not just high-end condos or 5+ acre lots in the country) are what's needed around here.
And, of course, that will take some doing...
Adam's blog is now roaming the dirt roads of Vermont, chronicling transportation and travels one hill at a time...
July 29, 2006
July 19, 2006
It's been a while. A few months while. Time for an update.
Below is a Letter to the Editor that I sent to the SunHerald today. It's regarding where housing costs have gone here on the Gulf Coast since Hurricane Katrina.
Title: One person's price gouging is another person's supply-and-demand.
Several times over the last few months, I've noticed complaints in Sound Off regarding how rent has shot up dramatically. The chief complaint I've read is that a given person's rent has gone up x dollars, or is now so high that they can no longer afford it. There have even some accusations of price gouging.
I understand where they're coming from, as my own rent will increase about $270 when my current lease expires. But while it's unfortunate what we've all gone through down here, and that some good hard-working people will be forced to move elsewhere because of high rent, it's just as unfortunate that some of these people haven't stopped to think about WHY rents have shot up through the roof around here.
Consider this: yes, we went through a major hurricane last year. That hurricane destroyed a lot of apartments and housing units. And while people did evacuate for the hurricane and did not return, that loss of population was made up for in the number of construction and other workers that flooded the area after Katrina. Furthermore, I've heard that there are several families that refuse to live in a FEMA trailer, and thus have looked for accommodations in other ways.
So in reality, the result is we have a similar (if not) higher level of demand for housing, contrasted against a big drop in the housing supply. Thus, housing costs and rents go up, often in big and surprising numbers.
If you truly think that price gouging is involved, contact your local supervisor or legislator. Contact the attorney general. Better yet, do the research yourself into how many apartment/housing units were lost, how many are available, and how many people there are trying to live in or find those remaining units.
Ultimately, the solution either way will require replacing the lost housing units or othewise increasing the housing supply. Contact your local officials and pressure them to support developments that will increase this supply, at prices that everyone can afford. Not every one, even middle-class, will be able to afford living in a condo.
Just don't sit and complain in an anonymous forum about the rents.
Below is a Letter to the Editor that I sent to the SunHerald today. It's regarding where housing costs have gone here on the Gulf Coast since Hurricane Katrina.
Title: One person's price gouging is another person's supply-and-demand.
Several times over the last few months, I've noticed complaints in Sound Off regarding how rent has shot up dramatically. The chief complaint I've read is that a given person's rent has gone up x dollars, or is now so high that they can no longer afford it. There have even some accusations of price gouging.
I understand where they're coming from, as my own rent will increase about $270 when my current lease expires. But while it's unfortunate what we've all gone through down here, and that some good hard-working people will be forced to move elsewhere because of high rent, it's just as unfortunate that some of these people haven't stopped to think about WHY rents have shot up through the roof around here.
Consider this: yes, we went through a major hurricane last year. That hurricane destroyed a lot of apartments and housing units. And while people did evacuate for the hurricane and did not return, that loss of population was made up for in the number of construction and other workers that flooded the area after Katrina. Furthermore, I've heard that there are several families that refuse to live in a FEMA trailer, and thus have looked for accommodations in other ways.
So in reality, the result is we have a similar (if not) higher level of demand for housing, contrasted against a big drop in the housing supply. Thus, housing costs and rents go up, often in big and surprising numbers.
If you truly think that price gouging is involved, contact your local supervisor or legislator. Contact the attorney general. Better yet, do the research yourself into how many apartment/housing units were lost, how many are available, and how many people there are trying to live in or find those remaining units.
Ultimately, the solution either way will require replacing the lost housing units or othewise increasing the housing supply. Contact your local officials and pressure them to support developments that will increase this supply, at prices that everyone can afford. Not every one, even middle-class, will be able to afford living in a condo.
Just don't sit and complain in an anonymous forum about the rents.
January 31, 2006
Highway project information online...or lack thereof...
The latter being mostly the case down here in Mississippi. Lately, it seems MDOT has been more interested in pushing its projects through rather than let the public know what's going on with them. Just today, the SunHerald ran an article about proposed improvements to MS 57 between I-10 and Vancleve that are a few years off, including mentioning that the Feds have signed off on the environmental assessment and that there's a preferred alternative. And this is one of the better cases, in that at least there was a section about the project on the MDOT website, even though the announcement about the public meetings that were held this summer wasn't posted on their website until well after the meetings were held.
And that's to say nothing about there being no MDOT news releases posted since New Year's, and getting to the news releases from last year is impossible due to some website glitches.
They could do a lot to learn how posting project information online can help the public input process...something MDOT has been sorely lacking in for a long time, not just with recent events.
And that's to say nothing about there being no MDOT news releases posted since New Year's, and getting to the news releases from last year is impossible due to some website glitches.
They could do a lot to learn how posting project information online can help the public input process...something MDOT has been sorely lacking in for a long time, not just with recent events.
January 30, 2006
Bridge debate, part X
A Letter to the Editor over the weekend, written by two people who were involved with the Renewal Forum held after the hurricane, basically blasted MDOT for their continued insistence on their proposed bridge design for the Biloxi-Ocean Springs span. They demand that MDOT scrap "Bridgezilla" and get on with building a temporary span along the path of the destroyed bridge (using the remaining pillars if possible), while everyone sits down and plans a new permanent bridge that everyone can agree with (or at least agree enough to get it built).
The two letter writers, and others of their peers, appear to have created two new websites to further their causes: www.msrenewalcoalition.org and www.bridgenow.org . The former looks to be a support page for the policies recommended by the Renewal Forum, while the latter is plainly a call for MDOT to scrap their design, build a temporary bridge, then plan and build a permanent bridge along the lines of that proposed in the Renewal Forum.
I took a look through the latter site this evening, in particular their FAQ. One particular entry in their FAQ perpetuates the theory, held by many of the Renewal forumers and those in Ocean Springs and the subject of several letters over the last month, that MDOT's 6-lane bridge proposal is really a "10-lane bridge".
I immediately sent an E-mail to the bridgenow.org people explaining the fallacy of this misinformation (I called it misinformation, anyway). Some of the particulars of MDOT's bridge proposal are available on their website if you know where to look (trust me, it took some digging). Their proposal is for, in each direction, 3 12-ft driving lanes, an 8-ft inside shoulder, and a 10-ft outside shoulder. For them to squeeze 5 lanes out of that, they would have to eliminate both shoulders and make the driving lanes about 10.5 feet wide, neither of which would be likely to pass muster with FHWA (the Feds), who would have a vote in the matter. Although it would result in only 6 feet of combined shoulder, having 4 lanes each way would be a future possibility, but 5 lanes each way is a bit of a stretch.
To my surprise (and impressment), I received a reply from a Dr. Jeffrey Bounds, who agreed that 10 lanes would be a stretch and said they would revise the FAQ to reflect such.
Goes to show that, even amidst disagreement (I disagree with the coalition on how many lanes the bridge needs, though I generally agree with their other positions on the bridge), there can still be civility. MDOT would do well to take a lesson on that...
The two letter writers, and others of their peers, appear to have created two new websites to further their causes: www.msrenewalcoalition.org and www.bridgenow.org . The former looks to be a support page for the policies recommended by the Renewal Forum, while the latter is plainly a call for MDOT to scrap their design, build a temporary bridge, then plan and build a permanent bridge along the lines of that proposed in the Renewal Forum.
I took a look through the latter site this evening, in particular their FAQ. One particular entry in their FAQ perpetuates the theory, held by many of the Renewal forumers and those in Ocean Springs and the subject of several letters over the last month, that MDOT's 6-lane bridge proposal is really a "10-lane bridge".
I immediately sent an E-mail to the bridgenow.org people explaining the fallacy of this misinformation (I called it misinformation, anyway). Some of the particulars of MDOT's bridge proposal are available on their website if you know where to look (trust me, it took some digging). Their proposal is for, in each direction, 3 12-ft driving lanes, an 8-ft inside shoulder, and a 10-ft outside shoulder. For them to squeeze 5 lanes out of that, they would have to eliminate both shoulders and make the driving lanes about 10.5 feet wide, neither of which would be likely to pass muster with FHWA (the Feds), who would have a vote in the matter. Although it would result in only 6 feet of combined shoulder, having 4 lanes each way would be a future possibility, but 5 lanes each way is a bit of a stretch.
To my surprise (and impressment), I received a reply from a Dr. Jeffrey Bounds, who agreed that 10 lanes would be a stretch and said they would revise the FAQ to reflect such.
Goes to show that, even amidst disagreement (I disagree with the coalition on how many lanes the bridge needs, though I generally agree with their other positions on the bridge), there can still be civility. MDOT would do well to take a lesson on that...
January 26, 2006
More bridge blues for MDOT
What little of MDOT's public image remains continues to take a downward slide, with two more recent events. First, they only received one bid for the Biloxi-Ocean Springs bridge replacement, which came in significantly higher than estimated. And the company that made that bid also bid on the Bay St. Louis bridge and preferred the latter if they had to choose between the two. So while MDOT now has a contract out for replacing the Bay St. Louis bridge (albeit $66 million higher than estimated), they're still without a contract for their Biloxi-Ocean Springs plan.
And as if that wasn't enough, the Coast Guard has now weighed in on the Biloxi-Ocean Springs bridge issues (now centered over the need of a drawbridge vs. a fixed-span), saying that MDOT needs to resolve those issues before they'll grant approval. Not only has Trinity Yachts said they need a drawbridge, but Northrup Grumman has piped in with the same concern, as has Harrison County's economic development coordinator.
It got back enough the past few days to where your's truly weighed in with a Letter to the Editor in the SunHerald. I basically lambasted both sides for ignorance when it came to the fight over adding a drawspan to MDOT's bridge proposal. And lo and behold, this morning in my E-mail box was an E-mail from the vice president of Trinity Yachts explaining his position and basically taking issue with my calling them ignorant.
Will be interesting to see how this all pans out, with there now being 4 major issues surrounding the bridge replacement (drawspan, number of lanes, location, and lack of bidders). Unfortunately, I don't think the final product will wind up serving the best interests of the Coast.
And as if that wasn't enough, the Coast Guard has now weighed in on the Biloxi-Ocean Springs bridge issues (now centered over the need of a drawbridge vs. a fixed-span), saying that MDOT needs to resolve those issues before they'll grant approval. Not only has Trinity Yachts said they need a drawbridge, but Northrup Grumman has piped in with the same concern, as has Harrison County's economic development coordinator.
It got back enough the past few days to where your's truly weighed in with a Letter to the Editor in the SunHerald. I basically lambasted both sides for ignorance when it came to the fight over adding a drawspan to MDOT's bridge proposal. And lo and behold, this morning in my E-mail box was an E-mail from the vice president of Trinity Yachts explaining his position and basically taking issue with my calling them ignorant.
Will be interesting to see how this all pans out, with there now being 4 major issues surrounding the bridge replacement (drawspan, number of lanes, location, and lack of bidders). Unfortunately, I don't think the final product will wind up serving the best interests of the Coast.
January 14, 2006
6-lanes for Biloxi-Ocean Springs Bridge
The handwriting is on the wall, so to speak. After hearing concerns from Ocean Springs Mayor Moran (who is against a 6-lane replacement for the Biloxi-Ocean Springs bridge) and reviewing traffic studies for the bridge done by both MDOT and the city, the Federal Highway Administration (FHWA) has endorsed MDOT's proposal for a 6-lane span. Short of a lawsuit, which would only delay the bridge that much further (something NEITHER side wants), MDOT's bridge proposal will proceed.
Somewhat unrelated, but possibly affecting the bridge proposal even further, is a letter sent by Harrison County Development Commission Executive Director Leland Speed to MDOT requesting a drawspan anyway, in order to promote additional industry along the county's Industrial Seaway. The driving force behind the letter is Trinity Yachts, who moved onto land along the seaway after Katrina and is a builder of large yachts. One yacht proposal they are bidding on would require a vertical clearance of up to 120 feet, significantly higher than the 85-foot clearance that MDOT's bridge proposal allows. The concern is that building a fixed-span either that low or without a drawspan will hamper industrial recruitment efforts, not to mention Trinity Yachts' hopes of winning the "mega-yacht" contract.
My thoughts: though I don't like the additional mainenance/operational costs of keeping a drawbridge at Biloxi-Ocean Springs (and neither does MDOT), there may be significant merit in keeping a drawbridge there, in that industrial development along the Seaway would help to diversify the Coast's economy plus give it a springboard to bounce back from the hurricane's destruction. Using the new Woodrow Wilson Bridge along the D.C. Beltway as an example, a well-designed drawbridge will reduce the number of drawbridge openings required, yet still have the flexibility that industry along the Seaway requires. My suggestion would be for a drawbridge with a 65 to 70 foot clearance, with drawspan openings by appointment and prohibited (except for emergencies) during peak traffic hours.
Somewhat unrelated, but possibly affecting the bridge proposal even further, is a letter sent by Harrison County Development Commission Executive Director Leland Speed to MDOT requesting a drawspan anyway, in order to promote additional industry along the county's Industrial Seaway. The driving force behind the letter is Trinity Yachts, who moved onto land along the seaway after Katrina and is a builder of large yachts. One yacht proposal they are bidding on would require a vertical clearance of up to 120 feet, significantly higher than the 85-foot clearance that MDOT's bridge proposal allows. The concern is that building a fixed-span either that low or without a drawspan will hamper industrial recruitment efforts, not to mention Trinity Yachts' hopes of winning the "mega-yacht" contract.
My thoughts: though I don't like the additional mainenance/operational costs of keeping a drawbridge at Biloxi-Ocean Springs (and neither does MDOT), there may be significant merit in keeping a drawbridge there, in that industrial development along the Seaway would help to diversify the Coast's economy plus give it a springboard to bounce back from the hurricane's destruction. Using the new Woodrow Wilson Bridge along the D.C. Beltway as an example, a well-designed drawbridge will reduce the number of drawbridge openings required, yet still have the flexibility that industry along the Seaway requires. My suggestion would be for a drawbridge with a 65 to 70 foot clearance, with drawspan openings by appointment and prohibited (except for emergencies) during peak traffic hours.
December 02, 2005
Building a new Biloxi-Ocean Springs bridge
A lot of discussion and debate from all over has gone into the proposal to replace US 90's bridge over Biloxi Bay (locally known as the Biloxi-Ocean Springs Bridge) in the wake of Hurricane Katrina. Many are at odds with MDOT because the feel MDOT is forcing their plan for the bridge down on them...especially those in Ocean Springs. Complaints up the wazoo have been made against MDOT for the way they're handling the situation. The SunHerald seems to have an article, letter, or sound byte every day about the bridge. From my unscientific poll, it seems comments in the SunHerald are 40/60 for/against MDOT's bridge plan.
Here's MDOT's plan: their plan is for a 93-ft high-rise bridge (high enough to eliminate the need for a draw span) at the same location as the bridge destroyed by Katrina. The bridge would be 6 lanes wide plus full shoulders and a bike/ped path...the cited width of the bridge is 120-ft.
The New Urbanists and Renewal Forumers, not surprisingly, are solidly against MDOT's plan. They feel A) that the bridge should be built along the CSX RR corridor, to tie into their vision of a relocated US 90 along the CSX corridor through Biloxi and Gulfport, and B) that the bridge should be no more than 4 lanes wide.
MDOT originally wanted the bridge contact let by the end of November. That's been put on hold due to a holdup in federal relief/recovery dollars...MDOT claims they've already spent $100 million on hurricane recovery, and until yesterday had only received $5 million in reimbursement from the Feds. Yesterday they got $20 million more, but that still leaves a $75 million backlog...significant when one considers a new Biloxi-Ocean Springs bridge will easily top $200 million, regardless of the design/location chosen.
My take on the bridge: I've borrowed elements from both sides in crafting my proposal. First up: MDOT should build a 2-lane "temporary" span at the existing location to get US 90 traffic at least moving and avoid an up-to-10-mile detour via I-10. The New Urbanists feel that this is the right way to go until a permanent bridge can be agreed upon and built, and I tend to agree.
My "permanent" solution, which is hingent on the CSX tracks being relocated north of I-10 as many propose, is to build a signature span generally at the location of the CSX RR crossing of Biloxi Bay. This span should be aesthetic in design, a high-bridge to eliminate need for a drawbridge span, and have 6 traffic lanes. The New Urbanists disagree, but I feel existing traffic is borderline enough to justify 6 lanes, and future traffic volumes will certainly warrant a wider span. Rather than full shoulders on both sides of each roadway, I would carry a 2-ft left shoulder and a 10-ft right shoulder on each side. My signature span would also carry a dual-track LRT line across the Bay. Although my span is wider than MDOT's proposal (132-ft vs 120-ft), my span carries both vehicle lanes and rail transit.
With a "permanent" span, the 2-lane "temporary" span could then be converted into a bicycle/pedestrian crossing, providing non-vehicular traffic a means to get across Biloxi Bay.
This and my other ideas for my transportation vision for the Gulf Coast can be found on my website here: http://www.ajfroggie.com/roads/gulfcoast/
Here's MDOT's plan: their plan is for a 93-ft high-rise bridge (high enough to eliminate the need for a draw span) at the same location as the bridge destroyed by Katrina. The bridge would be 6 lanes wide plus full shoulders and a bike/ped path...the cited width of the bridge is 120-ft.
The New Urbanists and Renewal Forumers, not surprisingly, are solidly against MDOT's plan. They feel A) that the bridge should be built along the CSX RR corridor, to tie into their vision of a relocated US 90 along the CSX corridor through Biloxi and Gulfport, and B) that the bridge should be no more than 4 lanes wide.
MDOT originally wanted the bridge contact let by the end of November. That's been put on hold due to a holdup in federal relief/recovery dollars...MDOT claims they've already spent $100 million on hurricane recovery, and until yesterday had only received $5 million in reimbursement from the Feds. Yesterday they got $20 million more, but that still leaves a $75 million backlog...significant when one considers a new Biloxi-Ocean Springs bridge will easily top $200 million, regardless of the design/location chosen.
My take on the bridge: I've borrowed elements from both sides in crafting my proposal. First up: MDOT should build a 2-lane "temporary" span at the existing location to get US 90 traffic at least moving and avoid an up-to-10-mile detour via I-10. The New Urbanists feel that this is the right way to go until a permanent bridge can be agreed upon and built, and I tend to agree.
My "permanent" solution, which is hingent on the CSX tracks being relocated north of I-10 as many propose, is to build a signature span generally at the location of the CSX RR crossing of Biloxi Bay. This span should be aesthetic in design, a high-bridge to eliminate need for a drawbridge span, and have 6 traffic lanes. The New Urbanists disagree, but I feel existing traffic is borderline enough to justify 6 lanes, and future traffic volumes will certainly warrant a wider span. Rather than full shoulders on both sides of each roadway, I would carry a 2-ft left shoulder and a 10-ft right shoulder on each side. My signature span would also carry a dual-track LRT line across the Bay. Although my span is wider than MDOT's proposal (132-ft vs 120-ft), my span carries both vehicle lanes and rail transit.
With a "permanent" span, the 2-lane "temporary" span could then be converted into a bicycle/pedestrian crossing, providing non-vehicular traffic a means to get across Biloxi Bay.
This and my other ideas for my transportation vision for the Gulf Coast can be found on my website here: http://www.ajfroggie.com/roads/gulfcoast/
November 08, 2005
A bit on gas prices...
There have been a lot of people along the Mississippi Gulf Coast complaining about gas prices and how much higher they are compared to nearby areas (like Mobile, Meridian, and Jackson). Many are claiming that the oil companies are price-gouging.
While I'm not discounting the possibility of price-gouging, I have to stop and wonder if any of these complainers have considered that...:
A) there are a lot more people along the coast...not just from New Orleans refugees but also *A LOT* of relief, recovery, and reconstruction workers.
B) because of (A), there are a lot more vehicles and a lot more traffic out on the road, using up a lot more gas than is normal around here.
It's a quintessential example of supply-and-demand.
Regarding (A), someone told me recently that officials are estimating there are around 45,000 people in Picayune right now. Before the hurricane, Picayune had around 11,000...
While I'm not discounting the possibility of price-gouging, I have to stop and wonder if any of these complainers have considered that...:
A) there are a lot more people along the coast...not just from New Orleans refugees but also *A LOT* of relief, recovery, and reconstruction workers.
B) because of (A), there are a lot more vehicles and a lot more traffic out on the road, using up a lot more gas than is normal around here.
It's a quintessential example of supply-and-demand.
Regarding (A), someone told me recently that officials are estimating there are around 45,000 people in Picayune right now. Before the hurricane, Picayune had around 11,000...
November 01, 2005
More catching up...
This time with my household goods...all that survived was my dining room table, and even that took some damage, though I think I'll be able to sand it down and refinish it.
As an aside, I never realized just how expensive kitchen stuff could be until I had to go and replace it all...
As an aside, I never realized just how expensive kitchen stuff could be until I had to go and replace it all...
October 02, 2005
A bit of catching-up
Quick notes since I haven't been on this thing in a month...
- My apartment fared quite well...only minor ceiling damage. My household goods are another story...even at this point, I still have no word on them.
- Not quite as much damage around Picayune as I thought there would have been. Most of it was wind damage...flying debris and such. Of course, you'd never know that from watching the news media, as they never made it up here after the storm...
- Household goods aside, things are starting to get back to normal...more or less back to normal ops at Stennis, which means I'll finally be getting busy with what I came down here to do originally.
- My apartment fared quite well...only minor ceiling damage. My household goods are another story...even at this point, I still have no word on them.
- Not quite as much damage around Picayune as I thought there would have been. Most of it was wind damage...flying debris and such. Of course, you'd never know that from watching the news media, as they never made it up here after the storm...
- Household goods aside, things are starting to get back to normal...more or less back to normal ops at Stennis, which means I'll finally be getting busy with what I came down here to do originally.
Subscribe to:
Posts (Atom)